A fine-tuned model passed evaluation in dev. What is the right path to production?
- Exam domain
- Optimize generative AI systems and model performance10–15% of the exam
- Difficulty
- Medium
- In this mock
- 11 questions on this domainPractise this domain
Why the exam asks this
Objective in the exam guide: Manage a fine-tuned model from development through production deployment.
A fine-tuned model is still a model release. The exam checks you apply the same discipline.
Why A is the answer
Deploy it, evaluate it against the base model on the production test set, and shift traffic gradually with a rollback option
A fine-tuned model is deployed like other models, then proven against the current one and rolled out gradually, keeping the old deployment for rollback.
How it works
After fine-tuning, the model must be deployed before it can serve requests.
It should be evaluated against the model it replaces, on the same test set and metrics.
Gradual rollout with the old deployment kept running limits risk, as for any model change.
Clues in the question
The words that point to the answer, and what each one tells you.
- Path to production
- Deploy, evaluate, roll out.
In detail
- Track the fine-tuned model's version and training data with the deployment.
- Monitor it in production with the same evaluators used before release.
Side by side with look-alikes
| Step | Skip it? |
|---|---|
| Deploy the fine-tuned model | No |
| Evaluate against the base model | No |
| Shift traffic gradually | No |
| Delete the old deployment | Only after it is no longer needed |
Every option, checked
Knowing why each wrong option fails is how you rule it out on exam day.
A. Deploy it, evaluate it against the base model on the production test set, and shift traffic gradually with a rollback optionRight
A fine-tuned model is deployed like other models, then proven against the current one and rolled out gradually, keeping the old deployment for rollback.
B. Replace the production deployment immediately because training succeededWrongMost tempting
Training success does not prove it beats production.
Why it tempts: Training finished with good loss, which feels like proof. But low training loss does not show it beats production on real questions.
C. Delete the base model deployment to save cost before testingWrong
Deleting the base removes your rollback.
D. Keep it in dev and copy its answers into production by handWrong
Copying answers by hand is not a deployment.
In practice
- Record the training file, base model and job ID in the deployment tags, so the release is traceable.