Which facility item must you confirm before GPU racks are delivered?
Why C is the answer
Rack power, cooling and floor load limits
GPU racks are heavy and consume a lot of power.
In detail
- GPU racks are heavy, and they use a lot of power.
- GPU racks are heavy.
Use case
An illustrative scenario, not a real incident.
A site checks that its floor can hold heavy GPU racks before delivery, and it finds a limit.
See it in different ways
flowchart LR A["GPU rack density"] --> B["Power per rack"] B --> C["Heat to remove"] C --> D["Air or liquid cooling"] D --> E["Floor and facility check"]
stateDiagram-v2 [*] --> Power Power --> Cooling: heat follows power Cooling --> Floor: weight limits Floor --> Delivery Delivery --> [*]
mindmap
root(("Facility checks"))
n1["Items"]
n2["Rack power"]
n3["Cooling"]
n4["Floor load"]Key point: Confirm power, cooling and floor load.
Why the other options are wrong
- A. The GPU driver versions to install
- A driver is not a facility limit.
- B. The job scheduler for the cluster
- A scheduler is not a facility limit.
- D. The server vendor's support contract
- A contract is not a facility limit.